domingo, 29 de septiembre de 2013

DUE DATE 30TH SEPT. 1ST REVIEW/GRADES

MONDAY 30TH SEPT. DEADLINE TO HAND IN:

1. Cafetería long term assignment:
- Plans (1st floor, 2nd floor, Roof floor)
- Elevations (north, south, east, west)
- Sections (3 sections, at least: through the stair facing towards the kitchen, trough the black room close to the stairs, and one longitudinal)
- Furniture (table and chair)

2. Short term assignments
. lay out of a croissant&leaf
- serbian scultptures
- object

3. Autocad
object and furniture, printed out

Everything in A3,clean, with your name, date, and well organized.


No hay comentarios:

Publicar un comentario